Early silt later, there is a need to repair in the apartment of Lolodnoye house. It is at this moment that the question is whether it is worth starting an independent repair or is it better to turn to your business professionals.
Those who appreciate their time and want to get an excellent result, opt for specialists, especially if you need repairs in a small room or in a small apartment. Since only real professionals, which you can find on can do everything according to the highest category and in the shortest possible time. And you do not have to rack your head over how to visually expand the space or make the room lighter. If you still decide to make repairs with your own hands, when you have to focus on the following stages of the repair:
Dismantling
We will start dismantling with the removal of all coatings from the walls of the ceiling. Water-dispersion paint is now the most common ceiling coating. In older apartments, whitewashing based on lime is more common. Less commonly, ceilings are covered with alkyd and oil enamels. Dispersion paint and enamel are not soluble in water. They should be removed with a spatula, sandpaper and other similar means. Lime whitewash is washed off to putty layers. Though a laborious lesson, but simple. How the new layer will lie on these operations. A painting roller, water and steel spatula is suitable for removal. The remains can be removed with a sponge. Old wallpapers are removed in the same way as lime coatings. But here you should be patient, since there is a great probability of multi -layer coatings. Modern wallpapers are removed from the walls much easier. A thin layer of paper may remain. If the wall is flat, it can be left. Wallpaper falls well on such a surface. Varnish and paint from the doors and platbands should be removed only if the surface exfoliates.
Preparation
Having finished the dismantling, we proceed to the preparation of the room. Damaged places should be expanded. It will be easier to penetrate the repair materials. Remove all sections of plaster. For hygroscopicity, the surface of a soil-water solution should be treated. This will allow the plaster to penetrate deeper into the concrete structure. So the surface layer will be significantly strengthened, ensuring the maximum clutch of mixtures with materials. Further, the surface is finally aligned. In this process, even minor irregularities are removed. We apply a layer of putty and press the grid into it, removing excess materials.
Painting the ceiling
The prepared surface of the ceiling is primed by already diluted water-dispersion paint. So we will reveal even minor defects. After grinding, the ceiling is painted with the paint of an already undemanded.
Wallpaper gluing
The surface of the walls is primed with prepared glue, which was diluted with clean water (up to 30%). Following the instructions for gluing certain wallpaper, we start work. We draw a vertical line in the place where we begin to glue. It will serve a guideline for the installation of the panels. Wallpapers of a modern sample are glued only at the junction. From this we can conclude that the gluing sequence does not matter. We cut out each piece of the canvas with a half -meter allowance. At the same time, do not forget about the combination of the pattern. This requires a clear selection. But undoubtedly, there are wallpaper that do not have an orderly texture. It will be much easier with them, and it will not have to be selected, which will accelerate the process. Cuts cut with a margins form excess material. They must be cut under a metal ruler with a sharp knife. Cut the lower edges, leaving a little for the junction with the baseboard. The final stage is the installation of borders. We draw a horizontal line around the perimeter of the room. We stick part of the wallpaper that will be above the border, and cut out along the drawn line. Carefully glue the curbs, removing the cut strip.